Buying a Property With Unlicensed Alterations in Portugal: What You Need to Know
uying property with unlicensed alterations in Portugal? Learn what to check, when legalisation may be possible and how to protect your Algarve purchase.
BUYING IN THE ALGARVE
Daniel and Bruna Rolph
11/13/20268 min read


The garage has become a guest bedroom. A terrace has been enclosed to create a larger living room. There is a pool behind the house that does not appear on the drawings you have received.
These are reasons to investigate before committing to a purchase. They are not, on their own, a complete diagnosis of the property's legal position.
When buying in Portugal, the important questions are what changed, which rules applied, what evidence exists and whether you can lawfully use the property as intended. A missing document, an outdated description and an unlawful extension require different responses.
Our advice is to resolve those questions with your independent lawyer and a suitably qualified architect or engineer before signing an unconditional contract or paying a substantial deposit.
Does every alteration need a licence?
No. “Unlicensed” can be a misleading shorthand because some works are exempt from licensing or follow a communication procedure.
Articles 4 and 6 of the RJUE planning framework distinguish procedures and exemptions. Certain conservation and interior alterations can be exempt, subject to conditions. Exemption does not remove the obligation to comply with applicable rules.
Ask a professional to assess the particular intervention, its date and any heritage or other restrictions. Do not assume either that every moved partition is unlawful or that everything inside a house is exempt.
Three situations to distinguish
Lawful work with supporting evidence. The relevant procedure was followed, or the work was exempt. Your advisers should identify any remaining record updates.
A discrepancy that needs explaining. A plan, measurement or description differs from another record. Establish the reason before labelling it illegal.
Work needing regularisation or correction. The necessary procedure was not followed, or the works do not comply. The next step is to establish the available remedy and its implications for the purchase.
For the wider document checks, see our guide to property due diligence in Portugal.
Can a property be sold if there is an unresolved planning issue?
The fact that a transaction can proceed does not establish that every part of the building is lawful.
The 2026 revision of the RJUE requires the relevant transfer document to record the corresponding urban-planning title when presented, or the seller's declaration that they have it when it is not presented, or that they do not have one. Your lawyer should explain the applicable wording and evidence for the purchase.
The main RJUE changes took effect on 1 October 2026, following the decree postponing commencement. Older explanations of the 2024 Simplex rules may therefore be incomplete.
A statement in the deed is not a technical comparison of today's house with its lawful plans. Request that comparison separately.
Which alterations deserve a closer look?
Enclosed balconies and terraces
If an open area has become part of the interior, ask your architect to establish how the enclosure is documented and which permissions or procedures were required. In an apartment, include the condominium position.
Converted garages, attics and basements
A room can look comfortable without being established as lawful habitable accommodation. Ask whether its intended use is supported by the documentation, and have the professional assess ventilation, access, ceiling heights and other relevant requirements.
Extensions, annexes and additional units
Check each structure rather than relying on the paperwork for the main house. If your plan depends on a separate guest apartment, establish whether that use is supported before including it in the property's value or projected income.
Pools, outbuildings and changed façades
Ask for the file covering these interventions. Their scale, location and characteristics matter; do not assume that every pool follows the same procedure.
These are prompts for investigation. We would not diagnose any of these features from an advert or photograph alone.
Compare the building with several records
One document rarely answers every question. Ask your advisers to assemble the relevant municipal file and compare it with the site, tax information and land registry.
The municipal building file
Request the relevant plans, amendments, decisions, communications and construction or use documentation. Ask which drawings establish the lawful position, and whether there are outstanding conditions, notices or enforcement proceedings.
A plan supplied by a seller might be a marketing drawing, a proposal or a submitted application. Have its status confirmed. Where a communication route applies, ask what establishes compliance under that route rather than expecting an approval stamp in every case.
The tax record
The caderneta predial is useful for checking the property's tax description and recorded areas. Article 12 of the IMI Code describes the tax register and limits its ownership presumption to tax purposes.
An area appearing in the tax record is not, by itself, planning permission. Paying IMI on additional space does not establish that the necessary building or use procedures were followed.
The land registry
The permanent land registry certificate shows current registrations and pending applications. Your lawyer uses the registry to assess title and registered burdens; your technical adviser still needs to examine the building's planning position.
The measured property
Have the actual layout, structures and relevant areas compared with the file. Different measurement definitions can explain some apparent discrepancies. A mismatch is a question to resolve, rather than automatic proof of unlawful construction.
Ask for a short written schedule showing each difference, its explanation and the remaining action. That is much more useful than being told simply that “the documents look fine”.
Apartments also need condominium checks
Municipal compliance and condominium rights are separate questions. An alteration affecting the façade, common areas or the title establishing the condominium can require additional consideration.
Article 1422 of the Civil Code includes rules on building appearance and permitted uses. Have your lawyer review the title, relevant resolutions and any consents for the actual work. A neighbour having a similar enclosure does not establish your seller's authority to install one.
What about a house said to be pre-1951?
Treat that as a claim requiring evidence about the building and its history. For example, Vila do Bispo provides an official certificate service for buildings predating 1951, with its own assessment requirements.
Ask the relevant municipality and your advisers what evidence applies to the property you are buying. In particular, establish whether later extensions or conversions need separate treatment. The age of the original cottage should not be used as an explanation for every structure standing there today.
An age-related certificate also does not replace a survey of the building's physical condition.
Can unlicensed work be legalised afterwards?
Sometimes. Article 102-A of the RJUE provides a legalisation route where conformity with applicable requirements can be secured. The municipality can require the relevant documents and technical material.
Start with a feasibility assessment. Ask the architect to consider the planning constraints, lawful existing development, proposed use, third-party rights and any corrective works needed. Request an estimate identifying what is included and what remains uncertain.
“An application has been submitted” and “the issue has been resolved” describe different stages. Ask your advisers what evidence will establish completion of the required process.
If regularisation is not feasible
The RJUE enforcement provisions allow measures that can include corrective works, stopping use and, where applicable, partial or total demolition. The response depends on the circumstances; demolition is not an automatic outcome for every discrepancy.
Ask your lawyer what existing notices or obligations mean for you as a purchaser. Do not assume changing ownership makes the issue disappear, or that a previous owner's personal fine and an obligation concerning the building are the same liability.
Who should deal with it before the sale?
Our preference is to establish the position before the buyer takes on an open-ended problem. The seller may be able to regularise the work or restore the property before completion.
If the parties want to proceed while matters remain outstanding, the buyer's lawyer should advise on suitable contractual protection. Discuss:
The precise issue and the agreed resolution.
Who commissions the work and pays the costs.
The documents or lawful procedural outcome required before completion.
A realistic deadline and how any extension must be agreed.
What happens to the contract and deposit if the agreed outcome is not achieved.
These are negotiation points, not a ready-made CPCV clause. An informal promise that the seller will “sort it out later” leaves too much unanswered.
If you need independent representation, our guide to choosing a lawyer in Portugal explains what to ask.
Will a price reduction cover the risk?
Only after you understand what the risk involves. A discount cannot establish that the extra room can lawfully remain.
A hypothetical garage conversion
Imagine a house marketed with three bedrooms. One occupies a space shown as a garage in the relevant drawings, and the seller offers €20,000 off to leave the issue with you.
Before considering that proposal, ask whether the conversion is lawful or can be regularised, whether correction is needed, and whether you would still want the home if the space must return to garage use.
Value the property on a defensible basis. Avoid paying an ordinary three-bedroom price while treating the status of the third bedroom as an administrative detail.
Your cost assessment should include professional work, municipal charges, any building works, record updates, delay and contingency. Obtain property-specific advice and quotations; there is no reliable flat “legalisation fee” for every home.
Keep these allowances separate from ordinary purchase taxes and fees, covered in our guide to the costs of buying property in Portugal.
Check finance, insurance and future plans
Send the identified issue to your broker or lender and ask for confirmation of its effect on the proposed loan and valuation. A personal borrowing assessment does not answer every question about a particular building.
Describe the property accurately to the insurer and ask about cover for the actual layout and intended use. Neither a mortgage offer nor an insurance policy replaces the planning assessment.
Also test your own plans. If the purchase only works because you expect to rent an annexe, add a pool or convert another room, obtain advice on that proposal before assuming it is available to you.
Cash buyers should make the same enquiries. Being able to fund completion does not resolve the underlying issue.
Our approach to these properties in the Algarve
We do not dismiss a home because its paperwork raises a question. We want that question answered clearly enough for a buyer to make an informed decision.
For a villa near Carvoeiro, an apartment in Portimão or a house outside Lagos, we would want the same essentials: an identified discrepancy, independent assessment, a realistic remedy and a contract that reflects the agreed position.
If the seller cannot provide access to the relevant information or allow a reasonable inspection, pause the commitment. If your advisers cannot establish a workable route and the property only suits you with the disputed space included, reconsider the purchase.
To discuss a property you are considering from Albufeira to Lagos, contact Bruna and Daniel at Team Rolph Properties. We can help coordinate the practical enquiries alongside your independent legal and technical advisers.
Frequently asked questions
Does a different floor plan always mean illegal work?
No. Establish which plan is authoritative, what changed and whether the work required a procedure. Some discrepancies reflect records or measurements that need explaining.
Does an extension appearing in the caderneta prove it is lawful?
No. Tax registration and planning compliance answer different questions. Ask for the supporting municipal and technical evidence.
Can I buy first and regularise the alterations later?
That may be a possible strategy after independent assessment, but it leaves you exposed to the outcome. Establish feasibility, costs and contractual implications before deciding to take it on.
Is a pre-1951 house exempt regardless of later work?
Do not make that assumption. Have the original building's status and any subsequent interventions assessed separately, using appropriate municipal evidence.
Is submitting a legalisation application enough?
It does not by itself demonstrate that the matter is resolved. Ask your advisers which outcome and supporting documents are needed for the particular procedure.
Do I need both a lawyer and an architect or engineer?
For a suspected planning discrepancy, their roles are complementary. The lawyer addresses legal and contractual consequences; the suitably qualified technical professional compares the building with its file and assesses the intervention and remedy.
General information checked on 31 October 2026. Requirements depend on the property, work, dates and applicable procedures. Obtain independent Portuguese legal and technical advice before committing to a purchase with an unresolved planning issue.